![]() ![]() Adhere to the drawings as closely as possible.Prior to the commencement of works, ensure that the areas for permanent installation are ready, accessible and in suitable condition.All materials and documentation relevant to this particular section of works will be checked and verified ensuring that these are correct and approved type.Store in accordance with the manufacturer’s instructions, above ground, properly protected from the weather and construction activities.Deliver components parts to site, completely identified in accordance with shop and certified CAD Drawings prepared for this work.The sizes and routes routing will be as per the approved Shop Drawings.Material used will be as approved by the Engineer.Specific safety measures have to follow as applicable, and all the safety measures are covered separately in the project safety plan. ![]() Ensure all involved personnel shall be aware of the same.Strictly followed as per the manufacturer’s Health and Safety recommendations for handling and use of the materials.QA/QC : Quality Assurance / Quality Control Engineer. Delivery and inspection upon arrival of material at site.This document details the Cable Tray and Trunking System Installation :.This procedure to clear the method of the supply, installations Cable Tray and Trunking System for the project.METHOD STATEMENT FOR Cable tray and trunking system installationġ. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |